Thought you all would like a progress report.
!. Bottom, rudder, CB, and electric drive mechanicals installed.
2.Two airtight bulkheads and cabin bulkhead (original) installed.
3.Original ceiling repaired and installed.
4.New structural mast "stirrup" bulkhead installed which supports the aft end of v-berth.
5.Two small cabinets and countertops made for the diminutive cabin.
6.Original margins installed with new teak cockpit sole.
7.Sawn deck beams installed.
8.New mahog house trunk/coamings bent and pre-fitted.
Currently installing deck and hoping to launch this summer. See album link below. Thanks for your interest. Back to work!
http://s425.photobucket.com/albums/pp337/jehutchisonjr/1932%20Herreshoff%20FI%2023%20Crusader%20restoration/